This guide covers the PC release version 1.2, standard power consumption settings, and no mods. It explains placing a Power Storage in a factory that has started using Coal Generators and checking its charge.
Unlock Expanded Power Infrastructure at Tier 4
Unlock Power Storage with the Tier 4 HUB milestone “Expanded Power Infrastructure.” If Tier 4 is not available, first finish the Phase 1 Space Elevator delivery.
This milestone requires delivery of 50 Encased Industrial Beams, 100 Steel Beams, 200 Modular Frames, and 2,000 Wire. Materials for the milestone delivery and for constructing the storage unit itself are separate.
| Construction materials for 1 Power Storage | Quantity |
|---|---|
| Wire | 100 |
| Modular Frame | 10 |
| Encased Industrial Beam | 5 |
If you cannot make Encased Industrial Beams, also check Tier 4 “Advanced Steel Production.” If you have not started making Steel, begin with feeding Iron Ore and Coal to a Foundry.
Connect it to an operating grid and check that its charge rises
Placing a Power Storage near your factory does not charge it. It must be wired to a grid with surplus power.
- Check the grid with operating power sources such as Coal Generators.
- Build the Power Storage and connect it to a pole on that grid.
- Approach a pole on the same grid and press E to open the power screen.
- Check the battery icon’s charge and the displayed time to charge.
- Wait briefly and check whether the stored amount has increased.
The “<” near the battery icon opens more storage details. Check the charge currently stored, not just the number of units you built, to know what backup power is available.
Biomass Burners reduce their output to match demand, so Biomass power alone cannot charge Power Storage. Spare capacity shown on a capacity figure does not mean that extra power is being generated to charge it. Connect storage after setting up Coal power, including Coal, Water, and startup power.
Distinguish 100 MWh of capacity from a 100 MW charge rate
One unit stores 100 MWh. Its maximum charge rate is 100 MW, so an empty unit receiving a constant 100 MW surplus would take one hour to fill.
A smaller surplus takes longer for the same unit. The following are calculations assuming the surplus stays constant and storage charges from empty to full without interruption.
| Power Storage units | Surplus available for charging | Full-charge calculation |
|---|---|---|
| 1 unit · 100 MWh total | 100 MW | 100 ÷ 100 = 1 hour |
| 1 unit · 100 MWh total | 50 MW | 100 ÷ 50 = 2 hours |
| 4 units · 400 MWh total | 100 MW across the grid | 400 ÷ 100 = 4 hours |
Increasing the total to four units does not automatically make the total charge rate 400 MW if the generation surplus is still 100 MW. You increase stored capacity, but still need enough generation for charging.
Factory consumption changes when machines switch from waiting for materials to production. Do not treat the table time as a fixed timer; check the actual charge and time display.
Fix generation or demand while storage covers the shortfall
When grid demand exceeds generation, Power Storage automatically supplies power from its charge. Do not assume that the 100 MW charge limit is also a 100 MW discharge limit. Discharge has no matching 100 MW cap.
When estimating how long the stored power will last, use the generation shortfall, not total factory consumption.
For example, with 400 MWh stored, if generation is 600 MW and consumption stays at 800 MW, the shortfall is 200 MW. The calculation 400 ÷ 200 = 2 hours is a theoretical estimate. The remaining time changes when factory or generator conditions change.
- When you notice the charge falling, compare current generation and consumption.
- If a generator has stopped, check fuel, water, and item delivery.
- If new equipment raised demand, stop nonessential machines or increase generation.
- After fixing the shortfall, confirm that the stored charge starts rising again.
The factory continuing to run while storage discharges is not the same as having enough generation. If charge keeps falling, adding more empty storage units alone will not solve the problem.
What to check if it will not charge or the grid goes down
| State | What to check |
|---|---|
| Built, but charge does not rise | Wiring to the same grid and generation surplus |
| Will not charge from Biomass power alone | Burners do not generate extra power for charging |
| More units make a full charge take longer | Whether surplus generation has increased for the larger total capacity |
| Factory runs but charge falls | Whether the grid remains in a generation shortfall |
| Charge ran out and the breaker tripped | Fix generation, fuel, or load, then restart |
If the circuit breaker is already tripped, follow How to fix the cause and reset the lever. After restoring power, check that the factory can sustain production when machines restart together and that storage can charge again.
Sources and references
Questions and contributions
Share questions, corrections or play reports. Only approved posts for this article and language appear here.
Submit for review
Do not include personal details, passwords or private information about others. Text only. Publication and replies are not guaranteed.