Scope: PC full release 1.2 series, standard building costs, no mods. Covers a first short transport route using a Mk.1 lift with default keyboard-and-mouse controls.

Complete Tier 1 Logistics

You may be able to use Conveyor Belts before Conveyor Lifts are unlocked. Check Tier 1 “Logistics” at the HUB terminal.

  1. Select the Logistics milestone.
  2. Submit 150 Iron Plates, 150 Iron Rods, and 300 Wire.
  3. Complete the milestone and check that Conveyor Lift Mk.1 appears in the build menu.
  4. Prepare Iron Plates for construction separately from the materials for the belts you will connect.

The quantities above are for the unlock, not for one lift. Required construction materials change with the lift’s height, so before building a long lift, check the missing materials shown on the hologram.

Mk.1 transports 60 items per minute. First test one short route carrying one item type, such as Iron Plates, from a lower container to an upper container.

Start at the output, then choose the height and exit

The way a lift looks as it extends upward and the direction items travel are separate. Start by deciding where the items will be taken from.

  1. Prepare a supply container for items and an empty receiving container.
  2. Select Conveyor Lift Mk.1 and position its starting point at the supply-side output. Insert a short belt if you want some spacing.
  3. Click the start point and look up or down to adjust the other end’s height.
  4. Rotate the port with the mouse wheel so it faces a direction that can connect to the receiving side.
  5. Confirm construction and connect a belt from the lift’s exit to the receiving input.
  6. Put a small amount of Iron Plates in the supply container and check that they reach the other side.

Checking the contents of both containers is easier than starting with a large flow when you are figuring out which direction the lift connects. Transport will not begin if items do not reach the entrance.

Before making a complex route through floors, first complete one vertical connection somewhere visible, such as outside the building, where you can see both endpoints and the belts.

Sending items down and when R will not reverse it

A Conveyor Lift is not limited to upward transport; it can carry items downward too. For a downward route, connect from the supply output at the higher location toward the receiving input below.

While building, press R to switch build mode and reverse the transport direction. However, if the direction is already determined by connecting to existing equipment’s input or output port or a belt, you cannot freely reverse it.

  1. First check whether the connected port is an input or an output.
  2. Confirm that you are starting from the output on the side supplying items.
  3. If placing the lift alone, press R to switch direction before confirming construction.
  4. If it is already built in the wrong direction, dismantle the affected lift and any necessary connections, then rebuild it.

The mouse wheel rotates the port to change which way it faces. Do not assume this alone swaps the material input and output.

If it looks connected but does not transport items

Placing a lift close to a machine is not the same as connecting it to a transport port. Check in order where items stop: the entrance, the lift, then the exit.

SituationWhat to check
Items stop before the entranceDo the belt and lift directions and the port positions match?
Items enter the lift but stop at the exitCheck the output belt and whether the receiving side has space
Items reach a production machine but are not usedAre they required by the recipe selected on that machine?
The connection points do not line upCan you add a short belt instead of forcing them together?
R will not change directionIs direction fixed by connection to an existing input/output port?

Before rebuilding the whole factory, one test is to connect the exit to an empty container and check transport. If items reach that container, next inspect material settings or whether the original receiving machine is full.

Faster belts do not make a Mk.1 lift exceed 60 per minute

If the lift runs but the destination lacks materials, check for a slower building remaining along the route. Even with Mk.2 belts, a Mk.1 lift in the middle is capped at 60 items per minute for that segment.

For a route that needs to carry 120 items per minute, replacing only the belt at the entrance can leave the lift as a bottleneck. If you have unlocked a higher-tier lift, match both the belts and lift to the required throughput.

When lifting materials to an Assembler making Reinforced Iron Plates, send Iron Plates and Screws to their respective inputs. This is not a machine that automatically sorts items if you mix them on one belt and lift. If you want to prioritize warehouse storage, use a separate Smart Splitter setup.

Sources and references

Questions and contributions

Share questions, corrections or play reports. Only approved posts for this article and language appear here.

Submit for review

Do not include personal details, passwords or private information about others. Text only. Publication and replies are not guaranteed.