Two different research unlocks
Scope: PC 1.6 base game, no DLC or mods; not the 1.7 unstable beta. Match Advanced component and the research names to your current localization.
Fabrication unlocks the bench. Advanced fabrication unlocks advanced-component production and requires a hi-tech research bench with a multi-analyzer. If research stalls, check analyzer links and power.
The first bench itself needs two advanced components. Obtain those through trade or another available source before trying to manufacture your own. For the complete building costs and initial setup, use the ordinary-component guide (Japanese).
Reserve all four ingredients
| Per advanced component | Amount |
|---|---|
| Regular component | 1 |
| Steel | 20 |
| Plasteel | 10 |
| Gold | 3 |
Extra steel cannot replace the regular component. Reserve ordinary components for repairs and construction, and decide how much plasteel you can spare from equipment plans.
Five advanced components therefore need 5 regular components, 100 steel, 50 plasteel and 15 gold. This arithmetic example excludes bench construction. It is a planning suggestion, not an optimal profit target or a fixed production time.
Test one production order
- Complete Advanced fabrication.
- Check bench power and access to its work spot.
- Assign a pawn with Crafting 8 or higher to Work's Smith category.
- Add Advanced component under Bills and start with one repetition.
- Check all ingredients, forbidden status, access and the Details ingredient radius.
- After one finishes, adjust quantity around your reserves and needs.
Crafting is a skill; Craft is a different work category. This bench uses Smith. Extra worker or skill restrictions in a bill can exclude an otherwise qualified pawn. Check work priorities and bill order too.
Ordinary components work, advanced ones do not
| Symptom | First check |
|---|---|
| Only ordinary components available | Advanced fabrication completion |
| Research stalled | Prerequisites, hi-tech bench and analyzer |
| Plenty of steel | Regular components, plasteel and gold also required |
| Worker ignores bench | Smith, Crafting 8, restrictions, access, power |
| Slow production | Progress and work speed, not just start conditions |
| Reserves consumed | Do forever, multiple bills and material budgets |
If switching to Do until you have X, verify the displayed inventory and order. Crafting and hauling are separate: use stockpile hauling checks (Japanese) for finished items left behind.
Sources and limits
Official 1.6.4850 and 1.7 beta announcements establish scope. Community wiki pages Advanced component, Fabrication bench, Research, Work and Bill support the recipe, Crafting 8, research equipment and Smith assignment. The five-unit budget is an editorial calculation. DLC, mods, 1.7, fixed timing and real production efficiency were not tested.
Sources and references
Questions and contributions
Submissions are currently paused. You cannot enter or send a post until reception resumes.