This guide covers PC version 1.0.5, standard settings, and no mods. Older Japanese guides may use a different name for the same Crusher. This article focuses on converting Stone and Wood.
Separate construction materials from the Stone to process
When you build a Crusher, the 20 Stone used as its construction material is already spent. You need additional Stone to make Paldium Fragments.
| Purpose | What you need |
|---|---|
| Build one Crusher | 50 Wood, 20 Stone, 10 Paldium Fragments |
| Make 1 Paldium Fragment | 5 additional Stone |
| Make 10 Paldium Fragments | 50 additional Stone |
| Operate the Crusher’s water wheel | A Pal with Watering suitability, level 1 or higher |
If you are starting with no stock and need both the machine and the first 10 Fragments, you need 50 Wood, 70 Stone, and 10 Paldium Fragments. The initial 10 Fragments are for building the equipment, so gather those first, for example from blue ore. Do not try to make construction materials in a machine you have not built yet.
For ongoing Stone and Wood, see the Logging Site and Stone Pit. Stone from a Stone Pit and Fragments made in the Crusher are separate production steps.
Build it, then assign a Pal with Watering
- Unlock the Crusher at Technology Level 8.
- Gather the materials and build it in an open spot at your base.
- Finish construction so the equipment is ready to use.
- Assign a Pal with Watering suitability, such as Pengullet, to your base.
- Keep a clear path so the worker can reach the Crusher.
Handiwork during construction and Watering to operate the water wheel are different jobs. A Pal assigned to mining Stone will not make the Crusher run by itself. Check the Watering suitability in the Pal’s stats rather than relying only on its Water type.
If the Pal switches to another Watering job, see work permissions and fixed assignments at the Monitoring Stand. First confirm that the initial order progresses before adding more machines to run at the same time.
Start with an order for 5 Stone and check completion and collection
- Open the Crusher and select Paldium Fragment.
- Choose the recipe that uses 5 Stone and check that the output is 1 Fragment.
- Start production and see whether the Watering worker begins the job.
- Collect the finished Fragment.
- Once you have made one, order only the remaining amount you need.
The Crusher has several conversion recipes. Do not select by the output name “Fragment” alone; for this example, check that the input is Stone. Avoid accidentally selecting a Sphere or another material from your inventory as an ingredient.
You need 50 Stone to make 10 Fragments. Do not count the 20 Stone for constructing the machine toward those 50 again. Keep the number of queued orders separate from the number of Fragments actually collected.
To make Fiber, process Wood instead
The Crusher converts 1 Wood into 2 Fiber. To get 20 Fiber, process 10 Wood.
| What you need | Input material |
|---|---|
| 10 Paldium Fragments | 50 Stone |
| 20 Fiber | 10 Wood |
The same Watering worker operates the machine for both recipes, but their inputs and outputs differ. Make a small amount of what you currently need, and avoid using up all Wood or Stone reserved for construction.
If the Fragments are for Spheres, see materials needed for Giga and Tera Spheres and replenish only the Fragments you lack.
Check the order, suitability, and path when it does not run
| Situation | What to check |
|---|---|
| It does not appear as a build option | Player level and Technology unlock |
| It is built but not working | Did you place an order for a finished product? |
| It does not run even though you have a Mining Pal | Is a Pal with Watering suitability assigned to the base? |
| The worker goes to another job | Work permissions, fixed assignment, and other Watering jobs |
| The Pal cannot reach the machine | Space around the equipment and its path |
| Finished stock is not increasing | Is the order still running or complete? Check collection and storage destination |
First confirm that one order finishes. Rather than adding more Stone Pits while conversion is stopped, it is easier to diagnose the issue by separating the Crusher’s assigned worker and its controls.
Sources and references
Questions and contributions
Share questions, corrections or play reports. Only approved posts for this article and language appear here.
Submit for review
Do not include personal details, passwords or private information about others. Text only. Publication and replies are not guaranteed.