At the Monitoring Stand, you can allow or disable each Pal’s work suitability and also assign it to a specific facility. These are separate settings. A Pal fixed to a facility may wait there when no work is available, so check what it does after narrowing its duties.

Scope: PC version 1.0.5, standard settings, no mods. Cross-checked against PalDB’s 1.0.5 display and Mobalytics’ instructions for version 1.0. Prefer the current in-game display and button labels. This has not been tested in-game.

Build the Monitoring Stand and keep the settings distinct

SettingRequirement or actionMeaning
TechnologyPlayer Level 7Separate from base level
Building materials30 Wood, 10 StonePlace inside the base and finish construction
Set Work PreferencesAllow or disable work suitability for each PalSeparate from prioritizing among enabled jobs
Fixed assignment managementChoose a Pal and a facilityFix the Pal to a specific facility

This does not teach a new job to a Pal that lacks the required work suitability. Check suitability and materials before assigning a Pal to a Ranch in Using the Ranch.

Test with one Pal and one facility in six steps

  1. Choose the job that is stopping. Decide what you want to continue, such as production, transport, or ranch work.
  2. Build the Monitoring Stand. Confirm the Level 7 unlock and 30 Wood plus 10 Stone, then finish construction.
  3. Check the base worker. Confirm the Pal has the required suitability and is assigned to work at the base.
  4. Adjust permissions only. In Set Work Preferences, allow or disable the suitability that this Pal may use. Do not remove every worker who can transport materials, for example.
  5. Fix it to a facility if needed. In Fixed assignment management, select a Pal and a facility. Treat this separately from choosing which kinds of work are allowed.
  6. Observe the work and what happens afterward. See whether the Pal waits there after the facility has no instruction or materials. Review an unnecessary fixed assignment in the management screen, then check both the setting and the actual worker.

Trying one Pal first and keeping necessary transport workers available are editorial suggestions. Do not fix everyone at once; watch the whole process from feeding materials to moving the finished product. Switching permissions does not rank enabled suitability as “first” or “second.”

If a fixed assignment does not work as expected

StateWhat to check
The Pal goes to another jobDid you only change permissions, or also set a fixed facility assignment?
The Pal waits at the selected facilityIs there a production instruction or material? A Pal may wait at a fixed destination with no work.
No worker is available for assignmentBase assignments and the required work suitability
Crafting progresses but items remainTransport workers, their permissions, and free storage space
Work stops for food or restFood, beds, SAN, and the route to the facility

Fixed assignments do not remove the need for food or rest. For pathing and health checks, see Food, suitability, and rest at the base. If you want a Cooler Box to be a continuing assignment, see Setting up a Cooler Box. This guide covers work permissions and facility assignment; it does not guarantee optimized work multipliers or uninterrupted operation.

Sources and references

Questions and contributions

Share questions, corrections or play reports. Only approved posts for this article and language appear here.

Submit for review

Do not include personal details, passwords or private information about others. Text only. Publication and replies are not guaranteed.