This guide covers PC 2.0.77, base game, normal quality, and no mods. It cross-checks fixed-version developer data and the official Wiki. It excludes Space Age quality and other planets, added 2.1 features, and in-game operation or placement tests.

Research the blue science technology and gather materials

Unlock the Electric furnace through Advanced material processing 2. In the base game, its prerequisites are Advanced material processing and Chemical science pack. The standard research cost is 250 each of Red, Green, and Blue Science packs. Purple Science packs are not required to unlock this research.

Materials for 1 Electric furnaceQuantity
Steel10
Advanced circuit5
Stone brick10

Use smelted Stone bricks, not Stone itself. Keep Electric furnaces intended for the smelting area separate from those planned for the materials for Purple Science. An Electric furnace sent to the Purple Science assembler will no longer be available in your construction stock!

Make room for a 3×3 footprint and power

The Electric furnace has a 3×3 footprint. Do not assume it can replace a Stone furnace or Steel furnace in the same spacing, since those are 2×2. The suggestion is to keep your existing line and first make a test spot for one Electric furnace beside it.

  1. Clear a 3×3 space and prepare inserters to feed ore and remove plates.
  2. Place the Electric furnace and inserters within the coverage of an Electric pole.
  3. Bring Iron ore or another smelting input to the input side. You do not need to supply Coal to the furnace.
  4. Place an inserter and a chest or belt on the output side.
  5. Check the furnace status and output; see whether Iron plates reach the pickup point.

An Electric pole connecting to other poles is separate from the furnace being inside a pole’s supply area. If you lack power, return to the Steam power checklist. For this test, add no modules or Beacons; check power, input, and output first.

No fuel does not mean faster than a Steel furnace

At normal quality and with no modules, the Electric furnace smelts at the same speed as a Steel furnace. Do not plan for double the plate output just from replacing a furnace. Its advantages are that it does not need fuel delivered to the furnace and it has two module slots.

Basic active power consumption is 180 kW per furnace. For 10 furnaces, the basic total is 1.8 MW, but this counts only the furnaces; it excludes inserters and other equipment, idle power, and module modifiers. Removing the fuel belt from the furnaces does not necessarily remove the need for fuel at the power source.

The suggestion is to confirm power generation and available capacity, then replace only the sections that need it. Separate being able to craft furnaces for Purple Science from being ready to electrify an entire smelting area.

Separate the causes when it will not run or plates do not increase

SituationWhat to check
Cannot select it in craftingResearch complete; Steel, Advanced circuits, and Stone bricks
Cannot place itClear 3×3 space and nearby belts or machines
Furnace does not runElectric pole coverage and connection, power generation, and input material
It stops partwayOutput is full; check the output inserter and destination
Furnace runs but plate supply is lowInput supply and output; do not expect a swap from Steel furnaces alone to increase production

Use belt and inserter input/output checks to find bottlenecks, and expand to multiple furnaces after one machine’s output is flowing! This is a small test for footprint and power differences, not a recommendation that every factory use the same number of furnaces.

Sources and references

Questions and contributions

Share questions, corrections or play reports. Only approved posts for this article and language appear here.

Submit for review

Do not include personal details, passwords or private information about others. Text only. Publication and replies are not guaranteed.