Prepare reactor, generators and fuel
PC stable 2.1.23, Space Age, normal quality, no extra mods; not a tested plumbing blueprint. Fusion research follows quantum processors: 2,000 each of automation, logistic, chemical, production, utility, space, metallurgic, agricultural, electromagnetic and cryogenic packs, 60 seconds per unit.
In a cryogenic plant, one reactor costs 200 tungsten plates, 200 superconductors and 250 quantum processors; one generator costs 100,100 and 50 respectively. A fusion power cell costs 5 lithium plates, 1 holmium plate and 100 ammonia. Reactor/generator manufacture requires pressure 100–600, Aquilo among standard planets; distinguish manufacture from placement. Uranium fuel cells and armor power equipment are different.
Establish the circuit
- Reserve 6 × 6 for the reactor and 3 × 5 per generator, fuel access and hot-fluid outlets.
- Supply fusion cells and cold fluoroketone to the reactor.
- Align generators with plasma connectors. Plasma cannot use ordinary pipes; check connectors after rotation.
- Pipe the generator’s hot fluoroketone to a cryogenic plant and return cooled fluid. Do not confuse plasma and ordinary liquid outlets.
- Provide external power to the reactor and cooling/supply equipment; confirm plasma and electricity production.
A normal reactor needs 10 MW to start and operate. Other equipment also needs power, so an exactly 10 MW source does not guarantee startup. If using accumulators, check stored energy and discharge capacity.
Gross output is not spare factory power
One normal reactor without neighbour bonuses supplies 100 MW of plasma potential; each generator caps at 50 MW. The basic two-generator example yields 100 MW gross, from which reactor 10 MW and cooling/auxiliary loads must be deducted.
The reactor uses up to 4 cold fluid/s; each generator consumes up to 2 plasma/s and returns the same amount as hot coolant. A closed fusion loop recycles it after cooling. Shared consumers such as quantum-processor production need separate accounting. Seehot/cold conversion.
Restart checks
A blocked hot outlet stops generation. Check fuel, cold inlet, plasma connection, hot outlet, cooler power and output, in order. On Aquilo, external coolant pipes can freeze even when generators do not. For a total blackout, isolate unnecessary loads, restart the reactor and loop using external power, then restore factory loads after confirming flow and spare output. Recalculate generator limits and startup demand when adding neighbours or quality; this is a diagnostic procedure, not a proven uninterrupted design.
Sources and references
Questions and contributions
Submissions are currently paused. You cannot enter or send a post until reception resumes.