Scope: PC 2.0.77 base game, normal quality, no mods, mouse and keyboard. This covers equipment upgrades when red fast belts are available and construction robots are operating. Space Age quality changes, 2.1 additions, other platforms, and in-game testing are outside scope.

Prepare the tool and the replacement separately

What to prepareHow it is used hereNote
Upgrade plannerTake it from the green shortcutAvailable based on a game’s construction robotics research history
Fast transport beltsReplacement for yellow beltsSelecting them does not increase your stock
Construction robots and operating rangeCarry out the replacement of placed equipmentDifferent from logistic robots
Materials and collection destinationInventory for personal robots; same network for a fixed oneCheck finished-item stock and room for collected items

For personal equipment, power, and robots, see Preparing a personal construction roboport. This guide focuses on correctly selecting upgrade targets for robots that are already operating, rather than repeating the setup process.

Six steps to replace only yellow belts with red ones

  1. Prepare the finished replacement items. Put fast transport belts for a short trial section where robots can access them.
  2. Take out the green planner. Select the upgrade icon on the shortcut bar. If it is missing, check display settings and research history.
  3. Put it in your inventory and right-click it. You cannot edit filters while it is held on the cursor; open its settings from your inventory.
  4. Set yellow on the left and red on the right. Choose transport belt as the before item and fast transport belt as the after item, then check what was selected.
  5. Drag over a short section with the left mouse button. Before releasing, check the preview to confirm the intended yellow belts will become red.
  6. Watch from the yellow circles until completion. Check that robots replace them with red belts and that items continue to flow to the exit.

A small preview and trial run are editorial suggestions. This filter covers ordinary transport belts only. To upgrade underground belts or splitters too, configure a separate before-and-after pair for each. Do not assume the whole line has been upgraded while some yellow sections remain.

How this differs from an empty planner

SettingBehaviorFirst decision
No filtersUpgrades eligible equipment to the next tierPreview because nearby equipment may also be included
Left: yellow belt, right: red beltReplaces the specified before item with the after itemUse for this single goal
Left and right reversedCan also downgrade from a higher tierRead left as current and right as target

An empty tool is not configured to select “only the belt you picked.” It can affect belts, underground belts, splitters, and eligible inserters or assemblers. Filter the targets when nearby equipment must remain unchanged.

The replacement selector shows candidates that are valid for the selected before item. This guide does not explain how to force an unavailable type or replace any entity with an arbitrary one.

If yellow circles remain or other equipment is selected

StateCheckNext action
Yellow circles remainConstruction coverage, charge, and construction robotsCheck operating range and power
Only some items are replacedWhether enough finished replacements are availableSupply the missing items
Circles appear on equipment to keepEmpty tool or a different filterIf not yet executed, hold Shift and drag over the area to cancel the queued order
Underground belts or splitters stay yellowWhether only ordinary belts were specifiedAdd separate upgrades for those targets if needed
Everything is red but downstream is blockedWhether collection or input is fullDiagnose the upgrade separately from a supply shortage

To cancel an unexecuted order, hold the planner, press Shift, and drag over the affected area. This does not automatically restore equipment that has already been upgraded. First check which parts still have pending orders.

When used on a ghost, unlike placed equipment, the planned entity type changes immediately. You still need the finished items for the changed plan. If you are using a shared layout, see Importing blueprints and construction ghosts. In this example, complete the upgrade on a short section of placed belts before proceeding to a larger area!

Sources and references

Questions and contributions

Share questions, corrections or play reports. Only approved posts for this article and language appear here.

Submit for review

Do not include personal details, passwords or private information about others. Text only. Publication and replies are not guaranteed.